Enercon Ep2 Windturbines V1.2

Date : 2022-05-16 13:21:07 Report

Enercon EP2 wind turbines with different hub heights.

Version 1.2:
- New towers for all plants
- All nacelles have been revised
- New rotor blades for all plants
- New lights for obstacle marking
- Revision of some textures
- 84m turret of E82 was replaced by 108m turret
- 124m turret of the E101 was replaced by 135m turret
- 125m turret of the E103 was replaced by 98m NG turret

Hello everyone!
This mod consists of 6 wind turbines of the EP2 platform with different hub heights.

The following are the features of the plants:
-All turbines adjust to the wind and change their speed depending on the wind speed.
-Anemometers are animated and adjust to wind speed.
-Obstacle marking adapts to the light conditions in the different seasons.
-The income per hour and the daily maintenance costs are one thousandth of the purchase price.

The following systems are included:
Enercon E70 EP2: 54m, 75m and 98m hub height (Price each: €50,000)
Enercon E82 EP2: 69m, 108m and 138m hub height (price each: €75,000)
Enercon E92 EP2: 78m, 108m and 138m hub height (price each: €125,000)
Enercon E101 EP2: 99m, 135m and 149m hub height (Price each: €175,000)
Enercon E103 EP2: 98m, 1108m and 138m hub height (Price each: €200,000)
Enercon E115 EP2: 92m, 122m and 149m hub height (Price each: €275,000)

You can find more pictures under the following post, as only a maximum of 5 file attachments are allowed here: Enercon EP2 wind turbines
The latest update includes major changes to all facilities. So there are new towers for all systems that come much closer to the real models than the old ones. The rotor blades now also have the trailing edge segments typical of Enercon. There were also minor adjustments, which can be found in the changelog.

PLEASE NOTE:
These are not 1:1 images of the real models. Only the hub height, the rotor diameter and the rough appearance are based on the real images!

Credits: FSven

Download File