Biogas Plant 450KW V1.0

Date : 2021-02-03 12:46:40 Report

BGA with 450kW power output and a small footprint for medium companies that have to pay attention to its size.
Can be used with or without ManureSystem.

Price: 365000 €
Capacity for Solids: 65000 l
Capacity for Slurry: 120000 l
Consumption per second for solids: 8 l
Consumption per second for slurry: 6 l
Maintenance costs: 225 €/Day
Dimensions: 20×30 m
Filling type: Silage, manure, liquid manure, potatoes, sugar beet, straw, hay
Manure System ready (for PC)
Seasons ready

Tested in FS19 1.7 version.

Credits: VertexDezign

Download File (45.8 MB)